OEM/ODM

Surface Treatment

Technic : Chrome plating, Nickel plating, Zinc plasting, PVD, Powder coating & Oxidation

Material: Brass, Bronze, Aluminum, Plastic, Steel & Stainless steel

Finish Samples:


Products includes the following:


* Plumbing * Equipment parts
* Sanitary ware * Electrical parts
* Auto parts * Customers products

Production Process:


Surface Treatment

Plating Product Testing


1. Salt Spray Test According to ASTM B 368 CASS
1.- Testing Conditions 2.- Salt Solution
1.1 Test Temperature: a.- Volumen of collected 26 ml/day
a.- Test Chamber 50 °c b.- P.H. of Collected 3.2 (5% Salt + 95% water)
b.- Humidity Tower 63° c c.- Salt Concentration 0.25 g/l (CuCl.2H2O)
3.- Air Supply 4.- Continuity Test
a.- Air pressure 0.10 Mpa a.- Exposure period 4 hrs

2. Plating Thickness SC-2

Standard: Ni Layer 8-10μm Cr Layer 0.15 - 0.25 μm


3. Heat Quench Test According to ASTM B571
1. Heat Test 2. Quench Test
a.- Temperature 250+/-5°c a.- Temperature 25+/-3°c
b.- Time 30 min b.- Time 30min

4. Thermal cycling Test According to ASTM B571
1. Temperature 2. Cycles
a.- High Temperature 75°c a.- Total cycles: 4
b.- Low Temperature -40°c